Built to Build: Blog
Labor Rate for Construction – How much to charge?
When it comes to running a successful construction business, determining the right labor rate can make or break your profitability. Charge too little and you may attract clients at the expense of your own bottom line. Charge too much and you risk pricing yourself out of the competition.
It’s a delicate balancing act, but it’s also the key to maintaining a successful business. In my article for FineHomebuilding.com, I break down the process for calculating the optimal labor rate per hour – the BASE RATE – allowing you to accurately and efficiently determine the numbers and stay ahead of the game. With this information at your fingertips, you’ll no longer have to lose the battle for profitability.
Developing a BASE RATE for your construction business will enable you to accurately price your work in less time.
For the purposes of this post, the BASE RATE* refers to the unit price of labor only that you will sell to your clients for each man-hour (M-HR) of work.
*The examples used here do not include the price of materials.
CALCULATING YOUR LABOR RATE (a.k.a – BASE RATE)
Calculating your labor rate is crucial for ensuring profitability and competitiveness in the construction industry. This involves determining a base rate based on the actual costs of your “average crew” size, from wages and benefits to equipment and materials. Accurately calculating your base rate can help you estimate project costs, price your services and set yourself up for long-term success.
Labor Rate Calculation Example
Let’s say that you have a 3-person crew with their respective wages listed below:
Employee #1 – Lead – $40.00/hr
Employee #2 – Journeyman – $25.00/hr
Employee #3 – Apprentice – $15.00/hr
The total crew cost per hour (without labor burden) is:
$40 + $25 + $15 = $80.00/hr
Assume a 20% factor for labor burden:
Total Crew Cost per hour including Labor Burden is:
1.2 Labor Burden Factor X $80.00/hr = $96.00
Now apply a markup to the total crew cost to determine the price for this 3-person crew.
In this example, the markup on the labor cost is 50%, or a markup factor of 1.5. This markup will produce a 33% margin. (See this post about margin and markup.)
Total Price / M-HR for a 3-person Crew:
$96.00 X 1.5 = $144.00
Based on this total crew price, the average price per person is $48.00/HR.
AVE. PRICE / CREW MEMBER / HR = $144.00 / 3 = $48.00
This average price per hour is the BASE RATE.
But before you use this BASE RATE in determining the price for your labor proposals, let’s examine the gross profit that this BASE RATE will produce for each crew member.
If Employee #1 earns $40/hr and the Labor Burden is 20%, then the cost of Employee # 1 is equal to:
Wage(per hr) X Labor Burden Factor = $40 X 1.2 = $48/hr
THE GROSS PROFIT FOR EMPLOYEE #1 IS:
BASE RATE – LABOR COST = GROSS PROFIT
$48/hr – $48/hr = $0/hr
GROSS MARGIN for Employee #1 = [ $0 / $48 ] X 100% = 0%
THE GROSS PROFIT FOR EMPLOYEE #2 IS:
$48/hr – ($25/hr X 1.2 ) = $18/hr
GROSS MARGIN for Employee #2 = [ $18 / $48 ] X 100% = 37.5%
THE GROSS PROFIT FOR EMPLOYEE #3 IS:
$48/hr – ($15/hr X 1.2 ) = $30/hr
GROSS MARGIN for Employee #2 = [ $30 / $48 ] X 100% = 62.5%
As you can see, this company doesn’t make any money on Employee #1.
Differing BASE RATES
When it comes to utilizing the BASE RATE for an employee, it may seem counterintuitive to do so if you aren’t going to profit off of that particular worker. However, it’s important to keep in mind that businesses often don’t send out just one employee at a time. Instead, you may send out a team of three or more to complete a project or job.
By using the BASE RATE for each employee on the team, the overall cost can still be lucrative for the company. Plus, it ensures that each employee is being paid a fair and consistent wage for their work. So while it may not seem immediately profitable for one worker, it can be a smart and cost-effective strategy in the grand scheme of things.
IT’S THE COMBINATION OF THE EMPLOYEES ON THE TEAM THAT MAKES THIS BASE RATE EASIER TO SELL.
If you priced all of the labor man-hours on a project based on your most expensive employee, then your price may be too high.
You would have to charge $72.00/hr for Employee #1 to make the desired margin of 33%.
$40/hr X 1.2 Labor Burden X 1.5 Markup = $72.00/hr
This rate may be tough to sell on a one-person job.
If you could add an additional crew member at a lower wage, then the BASE RATE would also drop.
Add Employee #2’s wage at $25/hr to Employee #1’s wage of $40/hr, multiply by the labor burden factor and the markup factor, and you will get a price for this two-person crew of $117.00
The BASE RATE for this 2-person crew is:
TOTAL PRICE/HR for 2-PERSON CREW / 2 PERSONS = $117.00 / 2 = $58.50/HR.
Not only is this BASE RATE easier to sell because it is a lower labor rate, but also the production efficiency should be higher.
Example of Labor Rate:
A Lead Carpenter can install crown molding by himself, but this task would be more efficient with an additional person.
This additional person does not need to be as skilled as the Lead. The additional person can perform less technical tasks as they relate to this job – job site setup and breakdown, measuring, holding the end of the piece of crown, etc.
I would argue that a Lead and an Apprentice carpenter can run this crown molding job very efficiently.
So if a Lead Carpenter and an Apprentice Carpenter were to perform this two-person job, then you would need to charge $99.00/hr for this work.
[ $40/hr + $15/hr ] X 1.2 Labor Burden X 1.5 Markup = $99.00/hr
The BASE RATE for this two-person team is $49.50 or $99.00 / 2.
Let’s round this number up just to make it easy on ourselves and set the BASE RATE at $50/hr/person.
USING BASE RATES TO DETERMINE LABOR RATE PRICES
In the examples above, the BASE RATES are as follows:
1-PERSON BASE RATE = $72/HR
2-PERSON BASE RATE = $58.50/HR/MAN (Lead and Journeyman)
2-PERSON BASE RATE = $50/HR/MAN (Lead and Apprentice)
3- PERSON BASE RATE = $48/HR/MAN
Now you can quickly determine the labor price for potential projects based on the amount of time you project and the approximate size of the crew.
By default, I would price most jobs for a 3-person crew using $50/HR/MAN as the BASE RATE.
Using this BASE RATE will allow for the proper margin with any combination of the crew assuming only one Lead per team.
If a project only requires 1-person, then I would use a $72/HR BASE RATE in combination with a minimum service fee.*
*Minimum Service Fee: The minimum price for a specified amount of labor.
For example:
A small repair job only requires one person, two hours to complete. The minimum service fee would be based on a minimum of 4 hours at $72/hr.
This small repair job would be quoted at $288.00 for the labor portion.
We know that if we price our work with a two or three-person crew, then we should be able to make the margins we have planned.
USING A BASE RATE TO DETERMINE THE PRICE OF CONSTRUCTION PROJECTS
Now that you know your BASE RATE for a 3-person crew, you can quickly determine the labor price for a potential project.
A project for a 3-person crew that takes 6 weeks can be calculated.
TOTAL LABOR PRICE = $50/HR/MN X 3 MEN X 6 WEEKS X 40 HR/WK = $36,000.
USING THE BASE RATE TO DETERMINE THE PROJECT’S SCHEDULE
The BASE RATE method also works in reverse.
Let’s assume that you know the labor budget for a given job is $55,000 and you want to determine the production schedule for a 3-person crew.
Using a BASE RATE of $50/HR/M, you can determine the production schedule.
LABOR BUDGET (PRICE) / BASE RATE / CREW SIZE / HR/WK = PRODUCTION SCHEDULE
$55,000 / $50/HR/M / 3-M CREW / 40 HRS/WK = 9.2 WEEKS
You must complete this project in about 9 weeks. We determined this schedule based on a BASE RATE of $50/HR/MAN for a 3-person crew.
But we know from the example above, that “our” 3-person crew BASE RATE can be as low as $48/HR/MAN and still be profitable.
We can recalculate the PRODUCTION SCHEDULE with the actual BASE RATE of $48/HR/MAN.
ACTUAL PRODUCTION SCHEDULE =
LABOR BUDGET (PRICE) / ACTUAL BASE RATE / CREW SIZE / HR/WK =
$55,000 / $48/HR/M / 3-M CREW / 40 HRS/WK = 9.5 WEEKS
In other words, each of the crew members can spend an average of 380 man-hours (9.5 weeks x 40 hrs/wk) on the project. If this project is completed in that amount of time, then this project will have a gross margin of 33%.
Develop a Base Rate for Your Average Crew Size
Developing a BASE RATE for your average crew size can increase not only your speed in producing estimates but also your accuracy in projecting your production schedule and your margins.
Establish a BASE RATE for various crew sizes based on the actual wage for each member of the crew. Factor in your labor burden and your markup. Use this number as your BASE RATE to estimate jobs and produce a production schedule.
When you have determined this information, communicate this to your crews.
Knowing this information is the key to running a profitable construction business.
And knowing is half the battle.
If you want to streamline your construction business and DOUBLE your profits next month…
Download my FREE book: The Paperwork Punch List